AYKA Terms and Policy Engineering Governance
LEGAL GOVERNANCE CONSOLE
VERSION 3.4//MARCH 2026
DOCUMENT CURRENT

Terms Engineered for Transparent Governance

Comprehensive operational framework governing AYKA Engitech's digital portal, turnkey Solar EPC, high-mast infrastructure, power distribution panels, and defense manufacturing contracts.

LEGAL JURISDICTION

Kolkata, WB, India

STATUTORY GSTIN

19ABACA8612Q1Z6

ESTIMATED READ

~8 Min (8 Clauses)

ACCREDITATION

CPRI / ERDA Tested

SHOWING 08 OF 08 CLAUSES
CLAUSE 01 // GOVERNANCE

Acceptance of Terms & Master Governance

Binding legal framework governing all physical, digital, and contractual interactions with AYKA Engitech Private Limited.

Welcome to AYKA Engitech Private Limited. By accessing this platform, engaging our engineering consultation services, or executing procurement and manufacturing contracts, you explicitly acknowledge that you have read, understood, and agreed to be legally bound by these Terms & Conditions.

These master terms govern your interactions with our corporate digital portal and all physical engineering operations spanning turnkey Solar EPC (Engineering, Procurement, and Construction), High-Mast Mast Tower infrastructure, HT/LT Switchgear Panel manufacturing, and specialized Defense fabrication.

CORPORATE ENTITY

AYKA Engitech Private Limited

GSTIN REGISTRATION

19ABACA8612Q1Z6

PAN IDENTIFIER

A8612Q

REGISTERED HEADQUARTERS

18, Rabindra Sarani, Terita Bazar, Poddar Court, Tiretti, Kolkata, West Bengal 700001

CLAUSE 02 // ENGINEERING

Engineering, EPC & Manufacturing Contracts

Execution frameworks for turnkey solar plants, power distribution panels, high-mast towers, EMS SCADA, and defense equipment.

AYKA Engitech provides specialized engineering, procurement, fabrication, and commissioning solutions across heavy industrial sectors. All technical specifications, load calculations, and lead times displayed online serve as preliminary engineering guidance.

Final project execution is strictly subject to site-specific technical audits, detailed structural feasibility assessments, and formal Master Service Agreements (MSAs) signed by authorized corporate signatories.

CLAUSE 03 // INTELLECTUAL PROPERTY

Intellectual Property & Proprietary Schematics

Exclusive ownership and strict statutory protections governing AYKA CAD drawings, firmware algorithms, and fabrication blueprints.

All technical assets displayed, transmitted, or generated by AYKA Engitech—including CAD blueprints, structural foundation calculations, embedded firmware for EMS SCADA controllers, PCB layouts, and proprietary manufacturing workflows—remain the exclusive intellectual property of AYKA Engitech Private Limited.

Our engineering designs and technical innovations are protected under the Indian Patents Act, 1970, and the Copyright Act, 1957, as well as applicable international intellectual property treaties.

CLAUSE 04 // COMMERCIAL

Commercial Milestones, Invoicing & Payment Gateways

Structured industrial milestone billing, statutory GST tax invoices, and secure multi-channel payment compliance.

Commercial engagements and procurement contracts follow structured industrial milestone schedules. All quotations and proforma invoices are denominated in Indian Rupees (INR) and are exclusive of applicable Goods and Services Tax (GST) unless explicitly stated.

Payments may be remitted via secure payment gateways (including Razorpay integrations for digital services) or corporate banking channels (RTGS, NEFT, Letter of Credit).

STRUCTURED INDUSTRIAL MILESTONES
01

Mobilization Advance

Contract execution & engineering procurement lock-in.

02

FAT Sign-Off

Factory Acceptance Testing verification & material readiness.

03

Dispatch & Transit

Material release upon clearance and statutory transit e-Way bills.

04

Erection & Testing

On-site mechanical erection and pre-commissioning checks.

05

Final Commissioning

Grid synchronization, trial run sign-off, and handover.

CLAUSE 05 // QUALITY

Quality Assurance, Warranties & Liability Limitations

CPRI/ERDA testing adherence, standard 12–24 month manufacturer warranties, and statutory limitation of liabilities.

All equipment manufactured by AYKA Engitech is built in strict adherence to relevant Bureau of Indian Standards (IS) and International Electrotechnical Commission (IEC) codes. Critical distribution panels and high-voltage assemblies undergo rigorous type-testing at CPRI (Central Power Research Institute) or ERDA accredited laboratories.

We stand behind our industrial craftsmanship with standard manufacturer warranties while defining clear boundaries of consequential liability.

LAB TESTING ACCREDITATION

CPRI & ERDA Certified Methodologies

STANDARDS COMPLIANCE

IS / IEC Quality Frameworks

STANDARD WARRANTY PERIOD

12 to 24 Months Equipment Coverage

CLAUSE 06 // HSE

Health, Safety & Environmental (HSE) On-Site Protocols

Mandatory on-site safety guidelines, personal protective equipment (PPE) compliance, and ISO 14001 environmental stewardship.

AYKA operates under a Zero-Harm safety philosophy. All field engineers, commissioning technicians, contractors, and client representatives present at AYKA project sites must adhere strictly to established Quality, Health, Safety, and Environmental (QHSE) protocols.

Our environmental operations align with ISO 14001 principles, prioritizing responsible industrial waste segregation, non-toxic surface treatment processes, and energy-efficient manufacturing.

CLAUSE 07 // LEGAL

Dispute Resolution, Arbitration & Legal Jurisdiction

Multi-tier dispute escalation framework, sole arbitration in Kolkata, and exclusive jurisdiction of the High Court of Calcutta.

These Terms & Conditions and all commercial contracts executed by AYKA Engitech Private Limited shall be governed by, construed, and enforced in accordance with the substantive laws of the Republic of India.

To ensure efficient commercial resolution, any disputes, controversies, or claims arising out of or in connection with our operations shall follow a structured, multi-tier escalation procedure.

STRUCTURED ESCALATION / AUDIT WORKFLOW
  • 01. Amicable Negotiation: Senior management consultation within 30 days of written notice.
  • 02. Formal Conciliation: Structured technical mediation by mutually appointed engineering experts.
  • 03. Sole Arbitration: Governed by the Indian Arbitration and Conciliation Act, 1996, seated in Kolkata, West Bengal.
  • 04. Judicial Jurisdiction: Exclusive jurisdiction of the competent Courts in Kolkata and the High Court of Calcutta.
CLAUSE 08 // POLICY

Policy Revisions, Digital Notices & Audit Trail

Version tracking, periodic legal reviews, electronic notice validity, and digital audit governance.

AYKA Engitech reserves the right to revise, update, or amend these Terms & Conditions periodically to reflect technological advancements, new product lines, or statutory amendments in industrial and energy regulations.

Continued utilization of our website, engineering portals, or ongoing commercial services following the publication of revised terms constitutes binding acceptance of the updated framework.

STRUCTURED ESCALATION / AUDIT WORKFLOW
  • Draft Review: Corporate legal & QHSE audit of statutory requirements.
  • Executive Approval: Board & Management sign-off on updated operational policies.
  • Digital Publication: Immediate deployment on the official AYKA portal with version logging.
  • Client Notification: Formal notice provided for material commercial changes on active MSAs.
KEY LEGAL TAKEAWAYS

Frequently Asked Legal Questions

Quick guidance on intellectual property, warranties, dispute escalation, and contracting scope.

CORPORATE LEGAL & COMPLIANCE

AYKA Legal & Governance Desk

For formal contract execution, custom Master Service Agreements (MSAs), intellectual property licensing, or statutory compliance queries, contact our legal representatives.