EMS Background

Smart Energy
Management Systems

Optimize your energy consumption, reduce peak demand tariffs, and enhance sustainability with AYKA's state-of-the-art Energy Management Systems (EMS)—delivering sub-second SCADA telemetry, automated APFC power factor correction, and dynamic load intelligence.

Power Factor0.99 Target
Peak Demand CutUp to 28.4%
Waveform Sampling64 Samples/Cycle
GovernanceISO 50001 / BEE

System Architecture & Data Pipeline

Explore how AYKA EMS aggregates multi-node power instrumentation, performs local edge processing, and feeds cloud telemetry for sub-second automated load dispatch.

End-to-End EMS Engineering Flow

Precision CT/PT & Multi-Function Energy Meters
IEC 62053-22 CLASS 0.2S
Class 0.2S Revenue Grade SamplingVERIFIED
NODE 01 // FIELD SENSORS & METERS
ACTIVE TELEMETRY CHANNEL

Precision CT/PT & Multi-Function Energy Meters

High-frequency current transformers (CT) and potential transformers (PT) sampling voltage, current, frequency, active/reactive energy, and harmonic THD at 64 samples/cycle.

Sampling Rate64 Samples / AC Cycle
Accuracy Class0.2S Revenue Grade
ParametersV, I, kW, kVA, kVAR, THD-V/I, PF
Transducer Isolation4.0 kV Galvanic Isolated
LIVE SCADA TELEMETRY STREAM (JSON)AES-256 TLS ENCRYPTED
{"node_id": "MTR-BUS-A1", "v_rms": [415.2, 414.8, 415.6], "i_rms": [642.1, 638.4, 640.9], "pf": 0.991, "freq_hz": 50.02, "thd_v_pct": 1.42}

Interactive Energy Telemetry Lab

Simulate dynamic peak-load shaving, active capacitor bank switching for 0.99 power factor regulation, and hybrid microgrid energy balance in real-time.

Live Telemetry & Optimization Engine

24-HOUR INDUSTRIAL LOAD CURVE (kW)
LIVE TELEMETRY TRACE
2400 kW1800 kW1200 kW600 kW00:0006:0012:00 (Peak)18:0024:00CAP: 2175 kW
Uncontrolled Grid Demand (Spike Peak)
AYKA EMS Shaved Ceiling
Peak Capping Target75% Threshold
Aggressive Shaving (55%)Light Smoothing (95%)
Max Demand Saved225 kVAPeak tariff penalty avoided
Estimated Monthly Saving₹ 1,68,750Calculated on HT industrial slab
Carbon Mitigated95 tCO2ePer monthly operating cycle
Grid Compliance 100% CEAZero penalty surcharge

Technical Rigor & Compliance Matrix

Engineered to meet stringent Indian and international grid standards, including CEA statutory guidelines and ISO 50001 energy governance.

Engineering ParameterAYKA EMS SpecificationStandard Industry PracticeOperational Advantage
Meter Accuracy StandardIEC 62053-22 Class 0.2S Revenue GradeClass 0.5 / 1.0 Commercial GradeSub-second capture of micro-tariffs and billing precision without margin error.
Data Ingestion Latency< 100ms SLDC & Cloud Synchronized15 – 60 Minutes Batch PollingInstantaneous peak load curtailment before the 15-minute utility penalty window expires.
APFC Power Factor Target0.990 to 0.998 Continuous Dynamic Lock0.92 – 0.95 Passive Fixed BanksMaximized electricity board power factor rebate while eliminating low-PF penalties.
Harmonic Mitigation (THD)IEEE 519 Compliant (< 3.0% THD-V, < 5.0% THD-I)Unfiltered (> 8.0% THD)Prevents transformer overheating, busbar resonance, and sensitive PLC component failures.
Communications & InteroperabilityModbus TCP, IEC 61850, MQTT, OPC-UA, BACnet IPProprietary Isolated ProtocolsSeamless plug-and-play retrofit into existing industrial SCADA and building management systems.

Ready to optimize
Your Industrial Energy Efficiency?

Contact our specialized engineering team today for an on-site telemetry audit and dynamic power factor simulation.