Retention &
Lifecycle Services
Maximize the lifecycle value of your infrastructure with AYKA's comprehensive retention services. We ensure longevity, reliability, and peak efficiency through 24/7 proactive maintenance and calibrated diagnostic support.
Don't replace healthy assets.Engineer their remaining life.
AYKA's retention protocol converts periodic maintenance into continuous asset-life engineering. Instead of waiting for degradation to become failure, every intervention is tied to measurable equipment health.
25+
Target Life
99.98%
Availability*
65%
Potential Capex Saving*
*Illustrative engineering targets. Actual performance and savings depend on asset condition, configuration and site conditions.
Test the retention logic.
Interactive engineering scenarios demonstrate how diagnostic thresholds, emergency response and modernization decisions influence operational outcomes.
BUSBAR TEMPERATURE DIFFERENTIAL
Increasing temperature differential indicates growing thermal imbalance. The simulator estimates the resulting contact resistance and electrical loss to demonstrate when intervention becomes increasingly important.
Recommended intervention
Perform contact resistance verification and targeted thermal inspection.

THE AYKA RETENTION PROTOCOL
Four engineering layers.One retained asset.
Calibrated Diagnostic Audits
FLIR 640×480 IR thermography, 5kV insulation testing and calibrated contact micro-ohm measurements.
Precision Mechanical Overhaul
VCB mechanism teardown, torque verification, contact wipe timing and mechanical condition restoration.
SCADA & Numerical Relay Grading
Secondary injection testing, protection curve discrimination and Modbus/MQTT gateway synchronization.
Statutory CEIG Governance
IS 3043 earth testing, transformer oil BDV verification and statutory renewal documentation.
Maintenance is not retention.
The distinction is engineering depth. Traditional AMC models focus on fixing faults; the AYKA approach focuses on controlling degradation before it becomes a replacement event.
| Evaluation Parameter | Traditional Third-Party AMC | AYKA Engineered Retention | Operational Advantage |
|---|---|---|---|
| Response Time SLA | Best-effort 24–48 hours | < 4 Hours Guaranteed Dispatch | Minimizes prolonged plant shutdown |
| Thermal Diagnostics | Visual inspection / basic IR | FLIR 640×480 calibrated thermography | Identifies early thermal anomalies |
| Relay Testing | Manual push-to-test | NABL secondary current injection | Protection coordination verification |
| Earth Resistance | Basic multimeter checks | IS 3043 fall-of-potential testing | Stronger statutory compliance evidence |
| Component Modernization | Replace complete switchboard | Engineered drop-in retrofit | Extends asset life at lower Capex |